• Version
  • 81 Download
  • 28.61 MB File Size
  • 12 File Count
  • September 1, 2023 Create Date
  • September 7, 2023 Last Updated

Bids are due on Sept 20, 2023 at 2pm CDT

Pre-Bid RFI due Sept 14, 2023 at 2pm CDT

Building info:

NEW CONSTRUCTION FOR DUTCH BROS COFFEE
 
THE BUILDING CONSISTS OF ONE DRIVE-THRU SERVICE WINDOW AND ONE WALK-UPSERVICE WINDOW; NO INDOOR OR OUTDOOR SEATING IS PROVIDED. SITE DEVELOPMENT INCLUDES A SMALL PARKING AREA, TWO DRIVE AISLES, AND A TRASH ENCLOSURE AREA. THE PARCEL IS CURRENTLY OCCUPIED BY ANOTHER BUILDING WHICH WILL BE FULLY DEMOLISHED.
 
NOTE: Pricing must be broken down as shown on the bid form in the projects files.
Pre-bid R.F.I.s must be turned in by the Sept 14, 2023.
 
All questions to be addressed to Sunbelt Construction, Inc.
Primary Contact: Mya Mustafa
E-mail: mmustafa@sunbeltconstructioninc.com
Phone: (270) 781-2859
Cell: (270) 938-3531
No Correspondence with the developer or the design team.

 

 

 


Download
FilePasswordAction
KY0202-Bowling-Green_ASMEP_2023-07-18-part-2.pdf 
KY0202-Bowling-Green_ASMEP_2023-07-18-part-1.pdf 
PCG-RFI-Submittal-Form.pdf 
KY0202-Bowling-Green-Bid-Form.xlsx 
KY0202-Bowling-Green_Survey_2023-05-24.pdf 
KY0202-Bowling-Green_Structural-Calcs_2023-07-07.pdf 
KY0202-Bowling-Green_Signage_2023-06-16.pdf 
KY0202-Bowling-Green_Photometric_2023-07-03.pdf 
KY0202-Bowling-Green_Geotech-Report_2023-05-24.pdf 
KY0202-Bowling-Green_Civil_2023-08-08.pdf 
KY0202-Bowling-Green_Asbestos-Survey_2023-06-06.pdf 
KY0202-Bowlin-Green_Phase-I-ESA_2023-05-08.pdf